Gold fromthe North.
Three deposits beyond the Arctic Circle and one responsible operation, from exploration to the refinery.
Our deposits
Kolyma Ridge
Main producing asset with on-site processing plant.
Vostok Creek
High-grade veins, year-round access road since 2018.
Lena Basin
Drilling programme, first resource estimate in 2021.
Operations
From ore to bar
Exploration
Airborne surveys and drilling map the ore body before a single road is built.
Mining
Open pit and underground, working year-round at minus forty.
Processing
Crushing, leaching and electrowinning at the Kolyma Ridge plant.
Refining
Doré bars go to an accredited refinery and come back as 999.9 gold.

Investors
Everything an investor needs, in one place
Results, reserves and governance documents, updated the day they are published. Nothing buried three menus deep.
- Annual report 2019
- Q3 2020 production and cost update
- Mineral reserves and resources statement
- Results calendar and webcasts
Responsible at every stage
Land restoration
Every hectare we disturb has a restoration plan before work begins. 38% is already restored.
Water
Closed-loop processing at Kolyma Ridge reuses 85% of process water.
Permafrost
Ground temperature sensors on all three sites, with readings published every quarter.
People of the North
We hire and train in the region first. Two in three people on site live in the North.
Careers
Work where the gold is
Geologists, engineers, operators and cooks. Four weeks on, four weeks off, with flights and full board covered.
999.9
From bare rock to bar
Every bar starts as ore from our own deposits and leaves the refinery as 999.9 fine gold, stamped with its melt number.